Broward service area

Tile Installation in Davie, FL

Davie limits construction sound on weekends, holidays, and weekday evenings, so loud work such as tile cutting belongs on weekdays before 7 p.m. Costa Tile Works provides tile installation in Davie, FL as part of our Broward County service area. We install floor tile, bathroom tile, and marble and natural stone in houses, townhomes, and condo units, using tile you provide or material we help you source.

The Town of Davie's noise code is stricter about weekends than many neighboring cities: construction sound on Saturdays, Sundays, and holidays is held to a low level at the property line all day. That makes Davie tile projects weekday projects for anything loud, and it is the first thing we plan around.

Shower with a random broken-stone mosaic accent wall and floor, square drain, and marble-look side walls
A shower with a broken-stone mosaic accent wall and floor.

Key points

Planning a tile project under Davie's rules

These notes come from the Town of Davie code and Building Division pages, plus a state law summary. They are not legal advice. Confirm the details for your property with the Building Division and, where you have one, your association.

Weekend and evening sound limits

Section 15-7 of the town code says construction, alteration, or repair work may not produce sound above 50 dBA at a real property boundary between 7:00 p.m. and 7:00 a.m., or at any time on Saturdays, Sundays, and holidays, unless the town grants a special variance. On weekdays between 7:00 a.m. and 7:00 p.m., the limit at the property boundary is 80 dBA.

Tile removal with a chipping hammer, grinding, and saw cutting are the loud parts of a job. We schedule them on weekdays and keep any weekend work, such as layout or cleanup, quiet. If you hoped for a weekend-only project, this rule is worth knowing before you plan around it.

Keeping a permit alive

The Building Division's general information page says permits are generally required for construction, alterations, and repair. Once issued, a permit expires if work does not start within 180 days, or if work stops for 90 days or no inspection is called within 90 days of the last one. For a bathroom remodel that waits on special-order stone, that matters: we order material early so the gap between demolition and tile does not stretch. The page also describes walk-through permits accepted on Wednesday mornings for listed permit types.

Older condo and apartment buildings

Davie's Building Safety Inspection Program page explains that, under Broward County policy, buildings 25 years or older need a structural and electrical safety inspection, then one every 10 years, and that a building permit is required for any repairs related to the inspection report. One- to four-family dwellings of three stories or less and fee simple townhouses are exempt. If you own a condo, ask whether your association has repairs open before scheduling.

The 2026 single-family exemption

For Davie houses, the 2026 state law HB 803 may exempt some lower-value single-family work from permits, but the Florida Senate summary leaves out flood hazard areas and plumbing, electrical, mechanical, gas, and structural work. If your floor retile is small and cosmetic, ask the Building Division how the town handles exemption requests before assuming either way.

Stone and tile choices for Davie homes

If you are weighing natural stone, from a marble bathroom to a travertine or limestone floor, plan for its variation. Natural stone varies from slab to slab and lot to lot, so we lay out a sample for written approval before setting. Stone, grout, and some other surfaces may need a sealer according to the maker's instructions, while porcelain and glazed ceramic generally do not; our guide on assigning sealer surface by surface shows how that is written into a quote.

Condo units and townhomes usually call for a simpler scope: floors and one or two bathrooms, with association approvals and building access planned first.

Services that fit Davie properties

Our services page lists everything we install, and the gallery shows finished work. For Davie homes and condos, these are the closest fits:

Photos from completed Costa projects

These are photographs of real Costa Tile Works installations, not stock images or renderings. More are in the project gallery.

Stone-look tile shower beside a double vanity
A stone-look tile shower next to a double vanity.

Before you request a quote

  • The address and whether it is a house, townhome, or condo unit
  • Measurements of each room or a floor plan, as our guide on measuring before you ask describes
  • Photos of the rooms and the existing floor at doorways
  • Your stone or tile choice, including whether it is already purchased
  • Any weekday constraints, since loud work cannot move to the weekend
  • For condos, the association's renovation rules

Send these details with the quote form.

Sources for local notes

Local planning notes on this page come from these public sources, checked on 2026-10-20. Rules change, so confirm them with the city or your association before work starts.

Frequently asked questions

Can a tile crew work on Saturday in Davie?

Only quietly. Davie's code limits construction sound to 50 dBA at the property line all day on Saturdays, Sundays, and holidays unless the town grants a special variance. That rules out tile removal and saw cutting in practice. Weekdays from 7:00 a.m. to 7:00 p.m. carry an 80 dBA limit, so loud work belongs there.

What happens if my bathroom remodel pauses while I wait for stone?

The permit can lapse. Davie's Building Division says a permit expires if work stops for 90 days or no inspection is called within 90 days of the last one. A lapsed permit means extra paperwork before work can resume. We suggest confirming stone availability before demolition and scheduling inspections steadily once work starts.

Does marble in a Davie bathroom need sealing?

Usually some surfaces do. Natural stone and cement grout may need a sealer according to the stone and sealer makers' instructions, while porcelain and glazed ceramic generally do not. We list which surfaces get sealer, and which product, on the quote so nothing is assumed.

Our townhome is fee simple. Does the 25-year inspection apply?

Davie's Building Safety Inspection Program page lists fee simple townhouses as exempt, along with one- to four-family dwellings of three stories or less. Condo and apartment buildings 25 years or older are generally covered. Confirm your building's status with the Building Division if you are unsure.

Start here

Send photos and a rough size for a written quote.

Tell us what is there now, what you want installed, and who is supplying the tile. Some projects need a site visit before the scope can be priced.

The secure form sends your project details and photos directly to Costa Tile Works.